435-563-6507
435-753-7600
Home
News/Events
City Council Minutes
Elections
Hometown Days
Hyde Park History
Job Openings
Miss Hyde Park City
Notices
Newsletters
News Flash
Planning Commission Minutes
Upcoming Public Events
Services
City Code
Forms
Good Neighbor Award
Payments & Reservations
Resources
Departments
Animal Control
Building
Business License
City
City Personnel
Court Information
Emergency Management
Park Reservations
Public Works
Planning
Utilities
North Park Police
Fraud Hotline
Calendar
Contact
Public Works
*** STORMWATER HOTLINE *** To report illicit discharges into a storm drain, call 435-363-6518.
General Information
2023 Annual Drinking Water Quality Report
Best Management Practices (BMPs)
- Sample of acceptable BMPs for common plan of development.
Cache Valley Storm Water Design Standard
Contractor SOP
- Standard operating procedures, Storm Water Coalition.
Household Hazardous Waste
- Hazardous waste facilities operated by Logan Landfill.
Snow Removal Policy
Water Hardness: 11-12
Max Curb Cut 30-feet
Forms
Stormwater Application (SWPP)
- Stormwater Pollution Prevention Plan for Development projects
Stormwater Application (SWPPP)
- Construction Activity Permit for building projects under 1 acre
Right-of-Way Excavation Permit
Cold Weather Paving Plan
Stormwater Management Program
2021 Plan
Construction Standards Please check out the standards
here
CW-01 3/4" & 1" Water Meter
- With 1" Water Service
CW-02 Trench Details
CW-03 Backflow Prevention
- Reduced pressure (ground)
CW-04 Backflow Prevention
- Reduced Pressure (Suspended)
CW-05 Backflow Prevention
- Double Check Valve (Surface)
CW-07A PRV - EFI Station
CW-07B PRV
- HYDEC Station
CW-08 Gate Valve
CW-09 Vent Cover
CW-10 Fire Hydrant Assembly
CW-11 Water Meter - 1.5" and 2"
CW-12 2" Air Vac Combination
CW-13 Blow-Off Hydrant
CW-18 Water Service Relocation
IR-01 Finish Grade
IR-02 Backflow Prevention
- Double Check 2" or Smaller sizes
IR-03 Control Valve Assembly
IR-04 Quick Coupling Valve Assembly
IR-05 Manual Drain Valve Assembly
IR-06 Gate Valve
IR-07 Trench Details
IR-08 Sleeving Detail
IR-09 Streetscape Head Pattern
IR-10 Thrust Block Details
IR-11 Rotor Pop-Up Detail
IR-12 Spray Pop-Up Detail
LP-01 Tree Planting & Staking
LP-02 Shrub Planting Detail
LP-03 Gate Assembly - Trail Heads
RD-01A - 50' Road Cross Section
RD-01B - 60' Road Cross Section
RD-01C 66' Road Cross Section
RD-01D 80' Road Cross Section
RD-01E 99' Road Cross Section
RD-01F 99' Road Cross Section
- 3700 North for 200' West of Hwy 91
RD-01G Partial Street Cross Sections
RD-02A Driveway Locations
RD-02B Driveway
- Without curb & gutter
RD-03 Asphalt Patch
- Longitudinal
RD-04 Standard Cul-De-Sac
RD-06 Street Lighting Layout
RD-06A Street Light Pole
RD-07 Standard Street Name Sign
RD-08 Standard Regulatory and Warning
RD-09 Street Light
T-Patch
APWA 2015 Standards
SS-01 Sanitary Sewer Manhole
SS-02 Sanitary Sewer
- Pipe Drop
SS-03 Sewer Manhole
SS-04 Sanitary Sewer
- Lateral Connection
SW-01 Secondary Water Details
- Part 1
SW-02 Secondary Water Details
- Part 2
Trench Type A
Trench Type F
Trench Type G
Trench Type S